Name of CFD UnitUnique IdentifierStart DateDate CFD Register Entry was Last UpdatedAllocation roundTechnology typeCFD Unit with Combined Heat and Power ("CHP") (yes/no)Dual Scheme PlantContent: Capacity of Whole Station (applicable to Biomass conversions or dual schemes only)Initial Installed Capacity Estimate for CFD UnitAny Reduction to the Capacity of a CFD UnitInitial Strike PriceCurrent strike priceChange to Strike Price (where applicable)Target Commissioning DateTarget Commissioning Window Start DateGenerator’s Expected Start DateCompany NameCountryAddress 1Address 2Town/CityCountyPostcodeCompany Registration NoUnique Geographical CoordinatesCFD Agreement Type (Investment, Generic, Private Network, Phased (Single Metering) or Phased (Apportioned)Version Name and Number of Standard TermsReference Number for Modification AgreementType of Connection (Partial, Direct or Islanded)Transmission or Distribution connection"Licence Exempt Embedded" or "Licence Connected" (applies to distribution connected only)Single Metering or Apportioned Metering (applies to phased offshore wind only)Offshore Leasing Round 2 or 3/Scottish Territorial Waters (applies to Offshore Wind only)Termination DateTermination Date comments
Teesside INV-TEE-001 Thursday, November 1, 2018 Investment Contract Dedicated Biomass with CHP Yes
No
299.00MW
299.00MW 0.00MW 125.00 £/MWh 138.94 £/MWh 13.94 £/MWh Tuesday, July 31, 2018 Tuesday, July 31, 2018 Saturday, February 29, 2020 MGT Teeside LimitedUnited KingdomBirkenhall MansionsBickenhall StreetLondonW1U 6PB 6574235 N: 54.600, -1.165; E: 54.603, -1.160; S: 54.601, -1.156; W: 54.598, -1.161 Investment Investment Contract MT0415A Direct Transmission
Hornsea Phase 1 INV-HOR-001 Thursday, November 1, 2018 Investment Contract Offshore Wind No
No
400.00MW 0.00MW 140.00 £/MWh 155.53 £/MWh 15.53 £/MWh Sunday, March 31, 2019 Sunday, March 31, 2019 Saturday, April 20, 2019 Hornsea 1 LimitedUnited Kingdom5 Howick PlaceLondonSW1P 1WG 7640868 N: 53.978, 1.742; E: 53.833, 1.897; S: 53.833, 1.897; W: 53.833, 1.649 Investment Investment Contract N/A Direct Transmission Metered Round 3
Hornsea Phase 2 INV-HOR-002 Thursday, November 1, 2018 Investment Contract Offshore Wind No
No
400.00MW 0.00MW 140.00 £/MWh 155.53 £/MWh 15.53 £/MWh Tuesday, March 31, 2020 Tuesday, March 31, 2020 Tuesday, March 31, 2020 Hornsea 1 LimitedUnited Kingdom5 Howick PlaceLondonSW1P 1WG 7640868 N: 53.956, 2.101; E: 53.836, 2.232; S: 53.828, 2.078; W: 53.924, 1.973 Investment Investment Contract N/A Direct Transmission Metered Round 3
Middle Muir Wind Farm AAA-BAN-192 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
0.00MW
60.00MW 9.00MW 82.50 £/MWh 91.94 £/MWh 9.44 £/MWh Sunday, March 31, 2019 Saturday, September 1, 2018 Wednesday, January 2, 2019 Banks Renewables (Middle Muir Wind Farm) LimitedUnited KingdomInkerman HouseSt Johns Road, MeadowfieldDurhamDH7 8XL 7376956 N: 55.529, -3.798; E: 55.507, -3.779; S: 55.487, -3.796; W: 55.497, -3.828 Generic Version: 1, 29 August 2014 N/A Direct Transmission
Common Barn Wind Farm AAA-COM-191 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
6.15MW 0.00MW 82.50 £/MWh 91.14 £/MWh 8.64 £/MWh Saturday, March 30, 2019 Sunday, September 30, 2018 Friday, March 1, 2019 Common Barn Wind Farm LtdUnited Kingdomc/o TCI Renewables Limited, Willow CourtMinns Business Park, 7 West WayOxfordOX2 0JB 8063892 N: 52.279, -0.287; E:52.271, -0.258; S: 52.265, -0.263; W: 52.274, -0.291 Generic Version 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
Hornsea Phase 3 INV-HOR-003 Thursday, November 1, 2018 Investment Contract Offshore Wind No
No
400.00MW 0.00MW 140.00 £/MWh 155.53 £/MWh 15.53 £/MWh Wednesday, March 31, 2021 Wednesday, March 31, 2021 Wednesday, March 31, 2021 Njord LimitedUnited Kingdom5 Howick PlaceLondonSW1P 1WG 7356468 N: 53.939, 1.865; E: 53.828, 2.078; S: 53.828, 2.078; W:53.928, 1.792 Investment Investment Contract N/A Direct Transmission Metered Round 3
Moor House Wind Farm AAA-BAN-190
Tuesday, April 3, 2018
Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
16.40MW 4.10MW 82.50 £/MWh 91.14 £/MWh 8.64 £/MWh Saturday, September 29, 2018 Sunday, October 1, 2017 Banks Renewables (Moor House Wind Farm) LimitedUnited KingdomInkerman HouseSt Johns Road, MeadowfieldDurhamDH7 8XL 6969180 N: 54.578, -1.498; E: 54.565, -1.476; S: 54.558, -1.496; W: 54.567, -1.514 Generic Version 1; 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
Dudgeon Phase 1 INV-DUD-001
Thursday, April 27, 2017
Thursday, November 1, 2018 Investment Contract Offshore Wind No
No
90.00MW 0.00MW 150.00 £/MWh 166.59 £/MWh 16.59 £/MWh Wednesday, March 1, 2017 Wednesday, March 1, 2017 Dudgeon Offshore Wind LimitedUnited Kingdom1 Kingdom StreetLondonW2 6BD 4418909 N: 53.266, 1.377; E: 53.209, 1.429; S: 53.209, 1.429; W: 53.240, 1.364 Investment Investment Contract N/A Direct Transmission Metered Round 2
Kype Muir Wind Farm AAA-BAN-189 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
104.00MW 15.60MW 82.50 £/MWh 91.94 £/MWh 9.44 £/MWh Sunday, March 31, 2019 Friday, March 1, 2019 Friday, March 1, 2019 Banks Renewables (Kype Muir Wind Farm) LimitedUnited KingdomInkerman HouseSt Johns Road, MeadowfieldDurhamDH7 8XL 6917667 N: 55.642, -4.091; E: 55.626, -4.011; S: 55.615, -4.028; W: 55.640, -4.094 Generic Version 1, 29 August 2014 N/A Direct Transmission
Dudgeon Phase 2 INV-DUD-002
Wednesday, August 2, 2017
Thursday, November 1, 2018 Investment Contract Offshore Wind No
No
210.00MW 0.00MW 150.00 £/MWh 166.59 £/MWh 16.59 £/MWh Tuesday, August 1, 2017 Tuesday, August 1, 2017 Dudgeon Offshore Wind LimitedUnited Kingdom1 Kingdom StreetLondonW2 6BD 4418909 N: 53.315, 1.342; E: 53.267, 1.446; S: 53.209, 1.429; W: 53.301, 1.321 Investment Investment Contract N/A Direct Transmission Metered Round 2
Wren Power and Pulp AAA-GEN-188 Thursday, November 1, 2018 Allocation Round 1 Energy from Waste with CHP Yes
No
49.75MW 0.00MW 80.00 £/MWh 88.38 £/MWh 8.38 £/MWh Wednesday, May 30, 2018 Saturday, March 31, 2018 Gent Fairhead & Co. LtdUnited KingdomCourt of NokePembridgeLeominsterHR6 9HW 2392879 N: 51.855, 0.645; E: 51.853, 0.649; S: 51.851, 0.646; W: 51.851, 0.643 Generic Version 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
Tralorg Wind Farm AAA-PNE-187 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
20.00MW 1.20MW 82.50 £/MWh 91.94 £/MWh 9.44 £/MWh Saturday, June 30, 2018 Saturday, June 30, 2018 Saturday, November 30, 2019 Tralorg Wind Farm LimitedUnited Kingdom99 BishopsgateLondonEC2M 3XD 6636519 N: 55.254, -4.801; E: 55.236, -4.786; S: 55.232, -4.804; W: 55.234, -4.814 Generic Version 1, 29 August 2014 N/A Direct Transmission
Dudgeon Phase 3 INV-DUD-003
Sunday, October 1, 2017
Thursday, November 1, 2018 Investment Contract Offshore Wind No
No
102.00MW 0.00MW 150.00 £/MWh 166.59 £/MWh 16.59 £/MWh Friday, December 15, 2017 Sunday, October 1, 2017 Dudgeon Offshore Wind LimitedUnited Kingdom1 Kingdom StreetLondonW2 6BD 4418909 N: 53.301, 1.321; E: 53.267, 1.377; S: 53.240, 1.364; W: 53.261, 1.318 Investment Investment Contract N/A Direct Transmission Metered Round 2
Clocaenog Forest Wind Farm AAA-CLO-186 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
96.00MW 0.00MW 82.50 £/MWh 91.14 £/MWh 8.64 £/MWh Thursday, November 1, 2018 Thursday, November 1, 2018 Thursday, September 5, 2019 Innogy Renewables UK LimitedUnited KingdomWindmill Hill Business ParkWhitehall WaySwindonWiltshireSN5 6PB 2550622 N: 53.113, -3.479; E: 53.057, -3.453; S: 53.043, -3.475; W: 53.098, -3.494 Generic Version 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
Burbo INV-BUR-001
Tuesday, April 11, 2017
Thursday, November 1, 2018 Investment Contract Offshore Wind No
No
258.00MW 0.00MW 150.00 £/MWh 166.59 £/MWh 16.59 £/MWh Friday, March 31, 2017 Friday, March 31, 2017 Burbo Extension LimitedUnited Kingdom5 Howick PlaceLondonSW1P 1WG 7307131 N: 53.503, 3.220; E: 53.470, 3.179; S: 43.464, 3.196; W: 53.503, 3.220 Investment Investment Contract N/A Direct Transmission Metered Extension
Bad a Cheo Wind Farm AAA-BAD-185 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
29.90MW 3.25MW 82.50 £/MWh 91.94 £/MWh 9.44 £/MWh Sunday, March 31, 2019 Sunday, March 31, 2019 Sunday, March 31, 2019 Innogy Renewables UK LimitedUnited KingdomWindmill Hill Business ParkWhitehall WaySwindonWiltshireSN5 6PB 2550622 N: 58.430, -3.431; E: 58.426, -3.418; S: 58.408, -3.422; W: 58.430, -3.431 Generic Version 1, 29 August 2014 N/A Direct Transmission
Beatrice Phase 1 INV-BEA-001 Thursday, November 1, 2018 Investment Contract Offshore Wind No
No
280.00MW 28.00MW 140.00 £/MWh 155.53 £/MWh 15.53 £/MWh Saturday, March 31, 2018 Saturday, March 31, 2018 Monday, November 5, 2018 Beatrice Offshore Wind Farm LimitedUnited KingdomInveralmond House200 Dunkeld RoadPerthPH1 3AQ SC350248 N: 58.286, -2.919; E: 58.224, -2.844; S: 58.164, -2.948; W: 58.197, -3.012 Investment Investment Contract N/A Direct Transmission Metered Scottish Territorial Waters
Beatrice Phase 2 INV-BEA-002 Thursday, November 1, 2018 Investment Contract Offshore Wind No
No
384.00MW 48.00MW 140.00 £/MWh 155.53 £/MWh 15.53 £/MWh Sunday, March 31, 2019 Sunday, March 31, 2019 Sunday, March 31, 2019 Beatrice Offshore Wind Farm LimitedUnited KingdomInveralmond House200 Dunkeld RoadPerthPH1 3AQ SC350248 N: 54.414, 1.798; E: 54.466, 1.798; S: 54.418, 1.780; W: 54.378, 1.787 Investment Investment Contract N/A Direct Transmission Metered Scottish Territorial Waters
Walney Phase 1 INV-WAL-001
Tuesday, December 19, 2017
Thursday, November 1, 2018 Investment Contract Offshore Wind No
No
330.00MW 0.00MW 150.00 £/MWh 166.59 £/MWh 16.59 £/MWh Friday, March 31, 2017 Friday, March 31, 2017 Walney Extension LimitedUnited Kingdom5 Howick PlaceLondonSW1P 1WG 7306956 N: 54.159, 3.777; E: 54.096, 3.749; S: 54.065, 3.764; W: 54.136, 3.919 Investment Investment Contract N/A Direct Transmission Metered Extension
Walney Phase 2 INV-WAL-002
Friday, April 13, 2018
Thursday, November 1, 2018 Investment Contract Offshore Wind No
No
330.00MW 0.00MW 150.00 £/MWh 166.59 £/MWh 16.59 £/MWh Saturday, March 31, 2018 Saturday, March 31, 2018 Walney Extension LimitedUnited Kingdom5 Howick PlaceLondonSW1P 1WG 7306956 N: 54.134, 3.749; E: 54.012, 3.526; S: 54.004, 3.568; W: 54.065, 3.764 Investment Investment Contract N/A Direct Transmission Metered Extension
Enviroparks Hirwaun Generation Site AAA-ENV-169 Thursday, November 1, 2018 Allocation Round 1 Advanced Conversion Technology No
No
11.00MW 0.00MW 119.89 £/MWh 132.45 £/MWh 12.56 £/MWh Saturday, March 31, 2018 Saturday, March 31, 2018 Enviroparks Operations LtdUnited KingdomTiverton ChambersLion StreetAbergavennyNP7 5PN 9259401 N: 51.751, -3.541; E: 51.751, -3.357; S: 51.748. -3.537; W: 51.749, -3.541 Generic Version: 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
Nanclach Wind Farm AAA-NAN-184 Wednesday, August 1, 2018 Allocation Round 1 Onshore Wind No
No
39.10MW 0.00MW 82.50 £/MWh 91.14 £/MWh 8.64 £/MWh Wednesday, October 31, 2018 Monday, October 1, 2018 Tuesday, June 18, 2019 Nanclach LimitedUnited KingdomFirst Floor St James House13 Kensington SquareLondonW8 5HD 5628358 N: 57.400, -3.895; E: 57.386, -3.884; S: 57.383, -3.893; W: 57.392, -3.916 Generic Version 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
EA 1, Phase 1 CAA-EAS-166 Thursday, November 1, 2018 Allocation Round 1 Offshore Wind No
No
179.00MW 0.00MW 119.89 £/MWh 133.29 £/MWh 13.40 £/MWh Saturday, March 31, 2018 Saturday, March 31, 2018 Wednesday, August 21, 2019 East Anglia One LimitedUnited Kingdom1 Tudor Street (3rd Floor)LondonEC4Y 0AH 7366753 N: 52.238, 2.563; E: 52.238, 2.563; S: 52.088, 2.524; W: 52.234, 2.477 Phased (Apportioned) Version: 1, 29 August 2014 N/A Direct Transmission Apportioned Round 3
Achlachan Wind Farm AAA-ACH-183 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
10.00MW 0.00MW 82.50 £/MWh 91.14 £/MWh 8.64 £/MWh Wednesday, October 31, 2018 Wednesday, October 31, 2018 Saturday, November 24, 2018 Achlachan Wind Farm LLPUnited Kingdomc/o BHP Accountants, 1st Floor Mayesbrook HouseRedvers CloseLeedsLS16 6QY OC393612 N: 58.453, -3.458; E: 58.448, -3.441; S: 58.441, -3.465; W: 58.446, -3.469 Generic Version 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
EA 1, Phase 2 CAA-EAS-167 Thursday, November 1, 2018 Allocation Round 1 Offshore Wind No
No
285.00MW 0.00MW 119.89 £/MWh 133.29 £/MWh 13.40 £/MWh Sunday, March 31, 2019 Sunday, March 31, 2019 Wednesday, November 27, 2019 East Anglia One LimitedUnited Kingdom1 Tudor Street (3rd Floor)LondonEC4Y 0AH 7366753 N: 52.304, 2.571; E: 52.304, 2.571; S: 52.079, 2.467; W: 52.193, 2.407 Phased (Apportioned) Version: 1, 29 August 2014 N/A Direct Transmission Apportioned
Coire Na Cloiche Windfarm AAA-COI-196 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
30.00MW 0.00MW 82.50 £/MWh 91.14 £/MWh 8.64 £/MWh Wednesday, October 31, 2018 Sunday, July 1, 2018 Friday, March 1, 2019 Coire Na Cloiche Windfarm LLPUnited Kingdomc/o Gillespie MacAndrew LLP5 Atholl CresentEdinburghEH3 8EJ SO304435 N: 57.796, -4.374; E: 57.792, -4.365; S: 57.784, -4.381; W: 57.792, -4.390 Generic Version 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
EA 1, Phase 3 CAA-EAS-168 Thursday, November 1, 2018 Allocation Round 1 Offshore Wind No
No
250.00MW 0.00MW 119.89 £/MWh 133.29 £/MWh 13.40 £/MWh Tuesday, March 31, 2020 Saturday, November 30, 2019 Sunday, March 29, 2020 East Anglia One LimitedUnited Kingdom1 Tudor Street (3rd Floor)LondonEC4Y 0AH 7366753 N: 52.390, 2.528; E: 52.304, 2.571; S: 52.193, 2.407; W: 52.297, 2.350 Phased (Apportioned) Version: 1, 29 August 2014 N/A Direct Transmission Apportioned
Dorenell Wind Farm AAA-DOR-182 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
177.00MW 0.00MW 82.50 £/MWh 91.94 £/MWh 9.44 £/MWh Monday, April 30, 2018 Sunday, April 15, 2018 Monday, January 28, 2019 Dorenell LimitedUnited Kingdom16 West BoroughWimborneBH21 1NG 5628395 N: 57.379, -3.097; E: 57.377, -3.096; S: 57.317, -3.138; W: 57.324, -3.170 Generic Version 1, 29 August 2014 N/A Direct Transmission
Energy Works (Hull) AAA-ENE-171 Thursday, November 1, 2018 Allocation Round 1 Advanced Conversion Technology No
No
25.00MW 0.00MW 119.89 £/MWh 132.45 £/MWh 12.56 £/MWh Monday, January 1, 2018 Monday, January 1, 2018 Friday, November 30, 2018 Energy Works (Hull) LimitedUnited KingdomOne Humber QuaysWellington Street WestHullHU1 2BN 7829330 N: 53.756, -0.329; E: 53.755, -0.327; S: 53.754, -0.327; W: 53.755, -0.328 Generic Version: 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
Solwaybank Wind Farm AAA-SOL-181 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
37.50MW 7.50MW 82.50 £/MWh 91.14 £/MWh 8.64 £/MWh Friday, March 29, 2019 Friday, March 29, 2019 Thursday, January 30, 2020 Solwaybank Energy LimitedUnited KingdomBeaufort CourtEgg Farm LaneKings LangleyWD4 8LR 9275294 N: 55.124, -3.114; E: 55.095, -3.064; S: 55.085, -3.084; W: 55.107, -3.131 Generic Version 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
K3 CHP Facility AAA-K3C-180 Thursday, November 1, 2018 Allocation Round 1 Energy from Waste with CHP Yes
No
45.00MW 0.00MW 80.00 £/MWh 88.38 £/MWh 8.38 £/MWh Saturday, December 15, 2018 Saturday, December 15, 2018 Monday, July 29, 2019 K3CHP LtdUnited KingdomPortland House (15th Floor)Stag PlaceLondonSW1E 5BH 9240062 N: 51.367, 0.762; E: 51.367, 0.764; S: 51.363, 0.759; W: 51.365, 0.758 Generic Version 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
BHEG Walsall AAA-ROY-172 Thursday, November 1, 2018 Allocation Round 1 Advanced Conversion Technology No
No
26.00MW 2.60MW 114.39 £/MWh 126.37 £/MWh 11.98 £/MWh Saturday, December 1, 2018 Saturday, September 1, 2018 BH EnergyGap (Walsall) LimitedUnited Kingdom1 Park RowLeedsLS1 5AB 9119505 N: 52.612, -2.009; E: 52.610, -2.009; S: 52.609, -2.010; W: 52.610, -2.012 Generic Version: 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
Neart na Gaoithe AAA-NEA-195 Thursday, November 1, 2018 Allocation Round 1 Offshore Wind No
No
448.00MW 0.00MW 114.39 £/MWh 127.21 £/MWh 12.82 £/MWh Thursday, March 31, 2022 Sunday, March 31, 2019 Thursday, September 15, 2022 Neart na Gaoithe Offshore Wind LimitedUnited Kingdomc/o Shepherd and Wedderburn LLP191 West George StreetGlasgowG2 2LB 356223 N: 56.339, -2.275; E: 56.212, -2.154; S: 55.915, -2.541; W: 55.916, -2.543 Generic Version: 1, 29 August 2014 N/A Direct Transmission Metered Round 3
Sneddon Law Community Wind Farm AAA-SNE-179 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
37.50MW 7.50MW 79.99 £/MWh 88.37 £/MWh 8.38 £/MWh Friday, June 30, 2017 Sunday, January 1, 2017 Sneddon Law Community Wind Company LimitedUnited KingdomCaledonian Exchange19A Canning StreetEdinburghEH3 8HE SC443267 N: 55.665, -4.330; E: 55.665, -4.330; S: 55.645, -4.351; W: 55.651, -4.351 Generic Version 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
Mynydd Y Gwair Wind Farm AAA-MYN-178 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
40.00MW 6.40MW 79.99 £/MWh 88.37 £/MWh 8.38 £/MWh Saturday, March 31, 2018 Saturday, March 31, 2018 Friday, March 1, 2019 Innogy Renewables UK LimitedUnited KingdomWindmill Hill Business ParkWhitehall WaySwindonWiltshireSN5 6PB 2550622 N: 51.763, -3.942; E: 51.747, -3.932; S: 51.747, -3.932; W: 51.752, -3.964 Generic Version 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
Netley Landfill Solar AAA-REG-175 Thursday, April 28, 2016 Allocation Round 1 Solar PV No
No
12.00MW 0.00MW 79.23 £/MWh 83.22 £/MWh 3.99 £/MWh Saturday, December 31, 2016 Saturday, October 1, 2016 REG Netley Solar LtdUnited KingdomEdgebourough HouseUpper Edgeborough RoadGuildfordGU1 2BJ 9060353 N: 50.892, -1.342; E: 50.890, -1.336; S: 50.883, -1.344; W: 50.899, -1.349 Generic Version: 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded Monday, March 21, 2016
Charity Farm AAA-LIG-176
Thursday, June 30, 2016
Thursday, November 1, 2018 Allocation Round 1 Solar PV No
No
14.67MW 2.73MW 79.23 £/MWh 87.53 £/MWh 8.30 £/MWh Thursday, June 30, 2016 Friday, April 1, 2016 Lightsource SPV136 LimitedUnited Kingdom7th Floor33 HolbornLondonEC1N 2HT 8769576 N: 52.825, -2.810; E: 52.821, -2.806; S: 52.819, -2.811; W: 52.822, -2.814 Generic Version: 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
Brenig Wind Farm - Brenig Wind Limited AAA-BRE-177 Thursday, November 1, 2018 Allocation Round 1 Onshore Wind No
No
45.00MW 7.40MW 79.23 £/MWh 87.53 £/MWh 8.30 £/MWh Thursday, March 30, 2017 Thursday, March 30, 2017 Brenig Wind LimitedUnited KingdomGlebe BarnGreat BarringtonBurfordOX18 4US 6001931 N: 53.119, -3.500; E: 53.113, -3.490; S: 53.095, -3.504; W: 53.104, -3.515 Generic Version: 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
Triangle Farm Solar Park AAA-CAM-197
Tuesday, July 18, 2017
Thursday, November 1, 2018 Allocation Round 1 Solar PV No
No
12.00MW 1.10MW 79.23 £/MWh 87.53 £/MWh 8.30 £/MWh Friday, July 1, 2016 Friday, July 1, 2016 Cambridgeshire County CouncilUnited KingdomShire HallCastle HillCambridgeCB3 0AP N: 52.330, 0.316; E: 52.328, 0.321; S: 53.323, 0.315; W: 52.326, 0.311 Generic Version: 1, 29 August 2014 N/A Direct Distribution Licence Exempt Embedded
Lynemouth Power Station INV-LYN-001
Saturday, June 23, 2018
Thursday, November 1, 2018 Investment Contract Biomass Conversion No
No
420.00MW
420.00MW 0.00MW 105.00 £/MWh 116.82 £/MWh 11.82 £/MWh Thursday, December 31, 2015 Thursday, December 31, 2015 Lynemouth Power LimitedUnited KingdomLynemouth Power StationAshingtonNorthumberlandNE63 9NW 07866585 N: 55.209, -1.531; E: 55.205, -1.515; S: 55.202, -1.524; W: 55.204, -1.527 Investment LP0116A Direct Distribution Licence Connected
Drax 3rd Conversion Unit (Unit 1) INV-DRX-001
Wednesday, December 21, 2016
Thursday, November 1, 2018 Investment Contract Biomass Conversion No
No
645.00MW
645.00MW 0.00MW 100.00 £/MWh 111.29 £/MWh 11.29 £/MWh Tuesday, December 1, 2015 Wednesday, July 1, 2015 Drax Power LimitedUnited KingdomDrax Power StationSelbyNorth YorkshireYO8 8PH 4883589 N: 53.735, -0.997; E: 53.735, -0.995; S: 53.734, -0.998; W: 53.734, -0.998 Investment N/A N/A Direct Transmission Licence Connected
Hinkley Point C NUC-HPC-198 Thursday, November 1, 2018 N/A Nuclear No
No
89.50 £/MWh 99.87 £/MWh 10.37 £/MWh NNB Generation Company (HPC) LimitedUnited Kingdom40 Grosvenor PlaceLondonSW1X 7EN 06937084 51.206950N, 3.1363641W Bespoke Direct Transmission
Moray Offshore Windfarm (East) Phase 1 AR2-MRY-107 Thursday, November 1, 2018 Allocation Round 2 Offshore Wind No
No
313.50MW 57.50 £/MWh 63.66 £/MWh 6.16 £/MWh Friday, April 1, 2022 Friday, April 1, 2022 Friday, April 1, 2022 Moray Offshore Windfarm (East) LimitedUnited Kingdom1st Floor14/18 City RoadCardiffCF24 3DL 07101438 N: 58.323, -2.738 E: 58.135, -2.570 S: 58.066, -2.913 W: 58.066, -2.913 Phased (Apportioned) Version 2, March 2017 N/A Direct Transmission Apportioned
Moray Offshore Windfarm (East) Phase 2 AR2-MRY-207 Thursday, November 1, 2018 Allocation Round 2 Offshore Wind No
No
313.50MW 57.50 £/MWh 63.66 £/MWh 6.16 £/MWh Saturday, April 2, 2022 Saturday, April 2, 2022 Saturday, April 2, 2022 Moray Offshore Windfarm (East) LimitedUnited Kingdom1st Floor14/18 City RoadCardiffCF24 3DL 07101438 N: 58.323, -2.738 E: 58.135, -2.570 S: 58.066, -2.913 W: 58.066, -2.913 Phased (Apportioned) Version 2, March 2017 N/A Direct Transmission Apportioned
Moray Offshore Windfarm (East) Phase 3 AR2-MRY-307 Thursday, November 1, 2018 Allocation Round 2 Offshore Wind No
No
323.00MW 57.50 £/MWh 63.66 £/MWh 6.16 £/MWh Sunday, April 3, 2022 Sunday, April 3, 2022 Sunday, April 3, 2022 Moray Offshore Windfarm (East) LimitedUnited Kingdom1st Floor14/18 City RoadCardiffCF24 3DL 07101438 N: 58.323, -2.738 E: 58.135, -2.570 S: 58.066, -2.913 W: 58.066, -2.913 Phased (Apportioned) Version 2, March 2017 N/A Direct Transmission Apportioned
Triton Knoll Offshore Wind Farm Phase 1 AR2-TKN-103 Thursday, November 1, 2018 Allocation Round 2 Offshore Wind No
No
219.00MW 74.75 £/MWh 82.75 £/MWh 8.00 £/MWh Thursday, March 31, 2022 Thursday, April 1, 2021 Sunday, May 2, 2021 Triton Knoll Offshore Wind Farm Limited United KingdomWindmill Hill Business ParkWhitehill WaySwindonWiltshireSN5 6PB 03696654 N: 53.538, 0.861, E: 53.409, 0.994 S:53.409, 0.934 W: 53.487, 0.691 Phased (Apportioned) Version 2, March 2017 N/A Direct Transmission Apportioned
Triton Knoll Offshore Wind Farm Phase 2 AR2-TKN-203 Thursday, November 1, 2018 Allocation Round 2 Offshore Wind No
No
212.00MW 74.75 £/MWh 82.75 £/MWh 8.00 £/MWh Tuesday, June 7, 2022 Tuesday, June 8, 2021 Thursday, June 24, 2021 Triton Knoll Offshore Wind Farm Limited United KingdomWindmill Hill Business ParkWhitehill WaySwindonWiltshireSN5 6PB 03696654 N: 53.538, 0.861, E: 53.409, 0.994 S:53.409, 0.934 W: 53.487, 0.691 Phased (Apportioned) Version 2, March 2017 N/A Direct Transmission Apportioned
Triton Knoll Offshore Wind Farm Phase 3 AR2-TKN-303 Thursday, November 1, 2018 Allocation Round 2 Offshore Wind No
No
429.00MW 74.75 £/MWh 82.75 £/MWh 8.00 £/MWh Sunday, August 28, 2022 Sunday, August 29, 2021 Saturday, September 18, 2021 Triton Knoll Offshore Wind Farm Limited United KingdomWindmill Hill Business ParkWhitehill WaySwindonWiltshireSN5 6PB 03696654 N: 53.538, 0.861, E: 53.409, 0.994 S:53.409, 0.934 W: 53.487, 0.691 Phased (Apportioned) Version 2, March 2017 N/A Direct Transmission Apportioned
Hornsea Project 2 Phase 1 AR2-HRN-106 Thursday, November 1, 2018 Allocation Round 2 Offshore Wind No
No
462.00MW 57.50 £/MWh 63.66 £/MWh 6.16 £/MWh Friday, March 31, 2023 Friday, April 1, 2022 Friday, April 1, 2022 Breesea Limited United Kingdom5 Howick PlaceLondonSW1P 1WG 07883217 N: 54.004, 1.671 E: 53.957, 2.102 S: 53.917, 1.996 W: 53.939, 1.631 Phased (Single Metering) Version 2, March 2017 N/A
Hornsea Project 2 Phase 2 AR2-HRN-206 Thursday, November 1, 2018 Allocation Round 2 Offshore Wind No
No
462.00MW 57.50 £/MWh 63.66 £/MWh 6.16 £/MWh Monday, April 1, 2024 Sunday, April 2, 2023 Sunday, April 2, 2023 Soundmark Wind LimitedUnited Kingdom5 Howick PlaceLondonSW1P 1WG 10721881 N: 54.009, 1.439 E: 54.004, 1.671 S: 53.920, 1.445 W: 54.009, 1.439 Phased (Single Metering) Version 2, March 2017 N/A
Hornsea Project 2 Phase 3 AR2-HRN-306 Thursday, November 1, 2018 Allocation Round 2 Offshore Wind No
No
462.00MW 57.50 £/MWh 63.66 £/MWh 6.16 £/MWh Tuesday, April 2, 2024 Monday, April 3, 2023 Monday, April 3, 2023 Sonningmay Wind LimitedUnited Kingdom5 Howick PlaceLondonSW1P 1WG 10722635 N: 53.939, 1.631 E: 53.926, 1.673 S: 53.835, 1.650 W: 53.920, 1.445 Phased (Single Metering) Version 2, March 2017 N/A
Blackbridge TGS 1 Limited AR2-PRO-005 Thursday, November 1, 2018 Allocation Round 2 Advanced Conversion Technology No
No
5.56MW 74.75 £/MWh 82.58 £/MWh 7.83 £/MWh Thursday, April 1, 2021 Thursday, April 1, 2021 Thursday, April 1, 2021 Think Greenergy TOPCO Limited United Kingdom7 Mitchell CourtCastle Mound WayRugbyCV23 0UY 09196100 N: 52.378, -0.666 E: 52.378, -0.666, S: 52.377, -0.666 W: 52.378, -0.666 Generic Version 2, March 2017 N/A Direct Distribution Licence Exempt Embedded
Drakelow Renewable Energy Centre AR2-DRK-414 Wednesday, August 1, 2018 Allocation Round 2 Advanced Conversion Technology No
No
15.00MW 74.75 £/MWh 82.58 £/MWh 7.83 £/MWh Thursday, April 1, 2021 Thursday, April 1, 2021 Thursday, April 1, 2021 Future Earth Energy (Drakelow) LimitedUnited Kingdom2nd Floor10 Greycoat PlaceLondonSW1P 1SB 09780052 N: 52.776, -1.657 E: 52.775, -1.655 S: 52.774, -1.656 W: 52.775, -1.659 Private Network Version 2, March 2017 N/A Partial Distribution Licence Exempt Embedded
IPIF Fort Industrial REC AR2-IFI-410 Thursday, November 1, 2018 Allocation Round 2 Advanced Conversion Technology No
No
10.20MW 74.75 £/MWh 82.58 £/MWh 7.83 £/MWh Tuesday, March 1, 2022 Wednesday, December 1, 2021 Tuesday, March 1, 2022 Legal and General Prop Partners (Ind Fund) LimitedUnited KingdomOne Coleman StreetLondonEC2R 5AA 03431928 N: 52.512, -1.800 E: 52.511, -1.800 S: 52.511, -1.802 W: 52.512, -1.802 Private Network Version 2, March 2017 N/A Partial Distribution Licence Exempt Embedded
Northacre Renewable Energy Centre AR2-NTC-404 Thursday, November 1, 2018 Allocation Round 2 Advanced Conversion Technology No
No
25.50MW 74.75 £/MWh 82.58 £/MWh 7.83 £/MWh Thursday, April 1, 2021 Thursday, April 1, 2021 Thursday, April 1, 2021 Northacre Renewable Energy Limited United KingdomWiltshire HouseCounty Park Business CentreSwindonSN1 2NR 07594338 N: 51.268, -2.206 E: 51.267, -2.204 S: 51.266, -2.207 W: 51.267, -2.208 Private Network Version 2, March 2017 N/A Partial Distribution Licence Exempt Embedded
Station Yard CFD 1 AR2-STY-002 Thursday, November 1, 2018 Allocation Round 2 Advanced Conversion Technology Yes
No
0.05MW 74.75 £/MWh 82.58 £/MWh 7.83 £/MWh Thursday, April 1, 2021 Wednesday, April 8, 2020 Wednesday, April 8, 2020 DC2 Engineering LimitedUnited KingdomTy BrycheiniogHeolgerrigMerthyr TydfilWalesCF48 1RE 08210771 N: 51.942, -3.891 E: 51.941, -3.890, S: 51.940, -3.891 W: 51.940, -3.892 Generic Version 2, March 2017 N/A Direct Distribution Licence Exempt Embedded Tuesday, October 2, 2018
Grangemouth Renewable Energy Plant AR2-GRN-401 Thursday, November 1, 2018 Allocation Round 2 Dedicated Biomass with CHP Yes
No
85.00MW 74.75 £/MWh 82.58 £/MWh 7.83 £/MWh Thursday, July 1, 2021 Thursday, July 1, 2021 Thursday, July 1, 2021 Grangemouth Renewable Energy LimitedUnited Kingdom15 Atholl CrescentEdinburghEH3 8HA SC488309 N: 56.027, -3.712 E: 56.025, -3.700 S: 56.021, -3.716, W: 56.022, -3.725 Private Network Version 2, March 2017 N/A Partial Distribution Licence Exempt Embedded Monday, October 8, 2018
Rebellion AR2-RBL-412 Thursday, November 1, 2018 Allocation Round 2 Dedicated Biomass with CHP Yes
No
0.64MW 74.75 £/MWh 82.58 £/MWh 7.83 £/MWh Thursday, April 1, 2021 Thursday, April 1, 2021 Thursday, April 1, 2021 Rebellion Biomass LLPUnited KingdomKentle Wood HouseBrowns RoadDaventryNN11 4NS OC403766 N: 52.428, -1.661 E: 52.428, -1.660, S: 52.427, -1.661, W: 52.427, -1.664 Private Network Version 2, March 2017 N/A Islanded Distribution Licence Exempt Embedded