Register of Temporary Site Exclusion

    

Name of Applicant/Generator

Grid Reference Co- ordinates

Map

Other Site Information

Date of CFD notification2

Future Earth Energy (Drakelow) Limited

N: 52.776, -1.657

E: 52.775, -1.655

S: 52.774, -1.656

W: 52.775, -1.659

Link to map

Location: bounded to the south and east by the Burton South main electrical substation with open brownfield land immediately in other directions.

11 September 2017

Grangemouth Renewable Energy Limited

N: 56.027, -3.712

E: 56.025, -3.700

S: 56.021, -3.716

W: 56.022, -3.725

Link to map

Location: Central Docks Road, Grangemouth within the site of the Port of Grangemouth, operated by Forth Ports.

11 September 2017

DC2 Engineering Limited

N: 51.942, -3.891

E: 51.941, -3.890

S: 51.940, -3.89

W: 51.940, -3.892

Link to map

Location: Situated in the town of Llangadog, 7 miles south-west of Llandovery.

11 September 2017

Redruth EFW Limited

N: 50.259, -5.189

E: 50.258, -5.187

S: 50.258, -5.188

W: 50.258, -5.189

Link to map

 

11 September 2017

1 This Register is published in accordance with the Contracts for Difference (Allocation) Regulations 2014 (as amended) which requires the Low Carbon Contracts Company Ltd, as the CFD counterparty, to establish and maintain a register of each excluded site to which a temporary site exclusion applies. The Register is required to contain the information included above.

 2 The CFD notification is defined in Regulation 42 of the Contracts for Difference (Allocation) Regulations 2014 and is the notice that the Delivery Body is required to give in respect of each successful CFD application which sets out information which enables Low Carbon Contracts Company to complete the terms and conditions applicable to the intended CFD.