Name of Applicant/ Generator | Grid Reference Co- ordinates | Map | Other Site Information | Date of CfD notification.** |
---|---|---|---|---|
Bockingfold Solar Limited |
N: 51.173, 0.463; E: 51.168, 0.45; S: 51.164, 0.445; W: 51.17, 0.431 |
Location: The site is located between Maidstone Road and Old Hay. |
8th September 2023 |
|
Rainsbrook Solar Limited |
N: 52.35, -1.2; E: 52.344, -1.192; S: 52.344, -1.193; W: 52.347, -1.203 |
Location: The site is located between Kilsby Lane and Reins Brook |
8th September 2023 |
|
Eastgate Solar LTD |
N: 54.253, -0.421; E: 54.245, -0.418; S: 54.245, -0.427; W: 54.248, -0.433 |
Location: The site is located between Stoney Haggs Rise and Seamer Road |
8th September 2023 |
|
Great House Energy Centre Ltd |
N: 51.8, -2.975 E: 51.794, -2.957 S: 51.791, -2.96 W: 51.798, -2.976 |
Location: The site is located between B4598 road and Church Lane road |
3rd September 2024 |
|
Maisemore Court Farm Energy Centre Limited |
N: 51.888, -2.274 E: 51.878, -2.267 S: 51.878, -2.267 W: 51.88, -2.281 |
Location: The site is located between River Leadon and A417 road |
3rd September 2024 |
|
Trinity Solar Farm Limited |
N: 51.918, -0.581 E: 51.917, -0.581 S: 51.913, -0.585 W: 51.917, -0.592 |
Location: The site is located between Tilsworth Road and Woodcock Lane |
3rd September 2024 |
|
Chirmorie Wind Farm Limited |
N: 55.071, -4.833 E: 55.057, -4.806 S: 55.035, -4.831 W: 55.046 -4.852 |
Location: This site is located in South Ayrshire, near Chirmoire, 5.5 km south-southwest from Barrhill. |
7 July 2022 |
|
Severn Trent Green Power Atherstone Limited |
N: 52.159; -1.73 E: 52.151; -1.723 S: 52.147; -1.723 W: 52.15; -1.735 |
The Facility is the Atherstone Hill Solar PV, Atherstone Hill Farm, Ascot Estate, Stratford-Upon-Avon, CV37 8LB, falling within the are delineated by the grid references on the left. |
8 September 2024 |
|
Severn Trent Green Power Church Farm Limited |
N: 52.709; -2.627 E: 52.707; -2.615 S: 52.703; -2.631 W: 52.708; -2.635 |
The Facility is the Church Farm Solar PV, Lands At Church Farm, Withington, Shrewsbury, SY4 4PZ, falling within the area delineated by the grid references on the left. |
8 September 2024 |
|
SSE Generation Limited |
N: 57.264; -4.705 E: 57.248; -4.633 S: 57.215; -4.686 W: 57.254; -4.733 |
Glenmoriston, IV63 7YH, falling within the area delineated by the grid references on the left. |
8 September 2024 |
|
Stornoway Wind Farm |
N: 58.235, -6.454 E:58.211, -6.418 S:58.187, -6.46 W: 58.193, -6.524 |
The wind farm is southwest of the town of Stornoway on the Isle of Lewis and centred on National Grid Reference (NGR) E137149, N933373, HS2 0DF, Scotland, falling within the area. |
7 July 2022 |
|
Orkney Community Wind Farm Project – Hoy |
N: 58.836, -3.231 E: 58.817, -3.203 S: 58.817, -3.215 W: 58.822, -3.297 |
The Remote Island Wind Farm is located on the island of Hoy. The main body of the site lies approx. 1.3KM west of Lyness. |
7 July 2022 |
* This Register is published in accordance with the Contracts for Difference (Allocation) Regulations 2014 Reg 14D which requires the Low Carbon Contracts Company Ltd, as the CfD Counterparty, to establish and maintain a register of each excluded site to which a temporary site exclusion applies. The Register is required to contain the information included above.
** The CfD notification is defined in Regulation 42 of the Contracts for Difference (Allocation) Regulations 2014 and is the notice that the Delivery Body is required to give in respect of each successful CfD application which sets out information which enables Low Carbon Contracts Company to complete the terms and conditions applicable to the intended CfD.
Quick Links
Contact Us
For enquiries or to speak to a member of the team, please fill in the contact form and we'll get back to you as soon as possible.
FAQs
View all frequently asked questions and our responses for our schemes and other resources.