Register of Temporary Site Exclusion

Register of Temporary Site Exclusion.*

Name of Applicant/ Generator Grid Reference Co- ordinates Map Other Site Information Date of CfD notification.**

Bockingfold

Solar

Limited

N: 51.173, 0.463;

E: 51.168, 0.45;

S: 51.164, 0.445;

W: 51.17, 0.431

Link to Map

Location: The site is located between Maidstone Road and Old Hay.  

8th September 2023

Rainsbrook

Solar

Limited

N: 52.35, -1.2;

E: 52.344, -1.192;

S: 52.344, -1.193;

W: 52.347, -1.203

Link to Map

Location: The site is located between Kilsby Lane and Reins Brook

8th September 2023

Eastgate

Solar

LTD

N: 54.253, -0.421;

E: 54.245, -0.418;

S: 54.245, -0.427;

W: 54.248, -0.433

Link to Map

Location: The site is located between Stoney Haggs Rise and Seamer Road

8th September 2023

Great House Energy Centre Ltd

N: 51.8, -2.975

E: 51.794, -2.957

S: 51.791, -2.96

W: 51.798, -2.976

Link to Map

Location: The site is located between B4598 road and Church Lane road

3rd September 2024

Maisemore Court Farm

Energy Centre Limited

N: 51.888, -2.274

E: 51.878, -2.267

S: 51.878, -2.267

W: 51.88, -2.281

Link to Map

Location: The site is located between River Leadon and A417 road

3rd September 2024

Trinity Solar Farm Limited

N: 51.918, -0.581

E: 51.917, -0.581

S: 51.913, -0.585

W: 51.917, -0.592

Link to Map

Location: The site is located between Tilsworth Road and Woodcock Lane

3rd September 2024

Chirmorie Wind Farm Limited

N: 55.071, -4.833

E: 55.057, -4.806

S: 55.035, -4.831

W: 55.046 -4.852

Link to map

Location: This site is located in South Ayrshire, near Chirmoire, 5.5 km south-southwest from Barrhill.

7 July 2022

Severn Trent Green Power Atherstone Limited

N: 52.159; -1.73

E: 52.151; -1.723

S: 52.147; -1.723

W: 52.15; -1.735

Link to map

The Facility is the Atherstone Hill Solar PV, Atherstone Hill Farm, Ascot Estate, Stratford-Upon-Avon, CV37 8LB, falling within the are delineated by the grid references on the left.

8 September 2024

Severn Trent Green Power Church Farm Limited

N: 52.709; -2.627

E: 52.707; -2.615

S: 52.703; -2.631

W: 52.708; -2.635

Link to map

The Facility is the Church Farm Solar PV, Lands At Church Farm, Withington, Shrewsbury, SY4 4PZ, falling within the area delineated by the grid references on the left.

8 September 2024

SSE Generation Limited

N: 57.264; -4.705

E: 57.248; -4.633

S: 57.215; -4.686

W: 57.254; -4.733

Link to map

Glenmoriston, IV63 7YH, falling within the area delineated by the grid references on the left.

8 September 2024

Stornoway Wind Farm

N: 58.235, -6.454

E:58.211, -6.418

S:58.187, -6.46

W: 58.193, -6.524

Link to map

The wind farm is southwest of the town of Stornoway on the Isle of Lewis and centred on National Grid Reference (NGR) E137149, N933373, HS2 0DF, Scotland, falling within the area.

7 July 2022

Orkney Community Wind Farm Project – Hoy

N: 58.836, -3.231

E: 58.817, -3.203

S: 58.817, -3.215

W: 58.822, -3.297

Link to map

The Remote Island Wind Farm is located on the island of Hoy. The main body of the site lies approx. 1.3KM west of Lyness.

7 July 2022

* This Register is published in accordance with the Contracts for Difference (Allocation) Regulations 2014 Reg 14D which requires the Low Carbon Contracts Company Ltd, as the CfD Counterparty, to establish and maintain a register of each excluded site to which a temporary site exclusion applies. The Register is required to contain the information included above.

**  The CfD notification is defined in Regulation 42 of the Contracts for Difference (Allocation) Regulations 2014 and is the notice that the Delivery Body is required to give in respect of each successful CfD application which sets out information which enables Low Carbon Contracts Company to complete the terms and conditions applicable to the intended CfD.